We’re giving this guide a refresh
Your feedback helps us make these guides even more useful. Use the buttons at the bottom of the article to tell us whether this one hit the mark or left you more confused than when you started. This helps us prioritise which articles are updated next.
Once Action Network Ladders have been published they can be set to one of three statuses: Active, Closed, or Stopped. You can control the status by selecting the toggle switch next to the Status you want to move your ladder into.
1. To schedule a change in your Ladder Status click on the link below the toggle switched labelled Schedule activate, close, or stop date.
2. Choose the status you wish to schedule, and set the date and time you want the status to change, then click SAVE.
3. The Ladder page will now show the scheduled change. If you need to change this, or cancel the future status change simply click on Edit or Cancel as necessary.